Construction pre-demolition work
In two days, the plumber will be here to disconect the supply and waste lines in the girls "old" bathroom in preparation for the full-scale demolition. All those pipes need to be stubbed out lower than the floor so that we don't get real messy when the walls come tumblin' down. So we removed the vanity, cut out the sheetrock, and removed the insulation to expose the pipes.
I tried the jigsaw, but the only blade I had in the house snapped off after just a few seconds. In drywall... wimpy blade.
| Michelle takes to the sheetrock between the toilet and tub, stopping for nothing! | Alan works around the back of the toilet, from the attic. |
In less than two hours, we had a bathroom full of chunks of wallboard, dust everywhere, and a clear view from the bathroom into the attic space where the new room will be built.
Michelle is now feeling quite anxious about the project, having seen her bathroom ripped apart. It's too late to turn back now, baby!
- Alan's blog
- Login or register to post comments

